BRIEF DESCRIPTION / YOUR ROOM EQUIPMENT

Tell us your space requirements and we will make the optimal floor plan for you!

The offices are available in the following basic configuration (deviations, changes, own wishes etc. are possible).
Send us your request – we are happy to help you!

Cost plan

Type of work

Basic config.
(Rough building)

Tenant finishing

2

Elements

 

 

211

Master-build Works

X

 

 

Payload concrete ceilings all floors 500kg/m2

X

 

212

Concrete and prefabricated brickwork assembly construction

X

 

215

Facade

X

 

221

Windows, external doors, gates

X

 

222 + 224

Plumbing and roofing work

X

 

 

Useful surface outdoor area 3rd floor and attic terrace (cement slabs)

X

 

225

Seals and insulation

X

 

 

Bulkheads (e.g. fire) for work on basic construction / tenant construction

X

X

227

External surface treatments

X

 

228

Sun protection with one radio control point (up/down electric blinds)

X

 

 

One control point up/down per quarter area and floor

X

 

230

Electrical installation

X

 

 

Main connections (electrical/TV/TT), main distribution boards (UV stations), entrance hall, staircase, underground car parks, ancillary rooms and wet rooms completely removed and installed. Lighting fixtures in entrance hall, staircase, underground car parks, ancillary rooms and wet rooms. Emergency and escape route lighting for daytime operation.

X

 

 

Electrical, telephone and IT cabling as well as basic and workplace lighting in the tenant areas (from transfer point at main distribution or UV stations). Sonnerie with intercom system and video from transfer point. Main distributions Expansion according to customer needs. Sunny area, intercom system and video, emergency lighting network from transfer point.

 

X

240

Heating installation

X

 

 

Heat generation: Geothermal probe heat pump system. Gas boiler switched on at peak load. Heat distribution in general: heating of common areas (WC, etc.) with heating walls Heat distribution in rental areas: Heating walls mounted under windows and convectors in front of windows. (Heating blankets etc. possible in tenant's interior) Heat measurement Rental areas: Separate measurement of heat consumption per tenant.

X

 

244

Ventilation system

X

 

 

General ventilation: Separate ventilation of common rooms. Ventilation of rental areas: Supply and return air led into the rental spaces.

X

 

 

Air distribution in the rental space Tenant improvements

 

X

250

Sanitary facilities

X

 

 

Sanitary rooms in general: Sanitary facilities of the common areas (WC etc.) completely installed and developed. Cold water rental areas: Cold water pipe led into the rental area with cold water meter. Hot water rental areas: Hot water pipe led into the rental area with hot water meter. Dirty water rental areas: Dirty water drainage pipe to the defined position of the kitchenettes inserted in the architect's plans. Position changes only conditionally possible.

X

 

258

Kitchen facilities

 

 

 

Provide sanitary installation (drain and Pex) per quarter floor area.

X

 

 

Kitchenettes in the tenant areas, incl. the necessary installations (el./san.)

 

X

261

Passenger elevators

X

 

271

Plasterer works

X

 

 

Entrance hall and staircase plastered walls and ceilings, walls wet rooms development core plastered (where not clad with ceramic tiles)

X

 

 

Walls Tenant areas

 

X

272

Metal construction work (interface to usable tenant area = development core)

X

 

 

One metal/glass end door per quarter storey area, stair railing

X

 

273

Carpentry work (interface to usable tenant area = development core)

X

 

 

Carpentry work for single and/or multi-person offices, meeting rooms etc. in the tenant areas

 

X

275

Locking system (interface to usable tenant area = development core)

X

 

 

Mechatronic locking system

 

 

277

Partition walls (interface to usable tenant area = development core)

 

 

 

Partition wall systems for single and/or multi-person offices, meeting rooms etc. in the tenant areas

 

X

281

Floor coverings

X

 

 

Hollow floor construction (double floor for textile floor covering) for easy installation, without floor coverings. Access core with granite or ceramic slabs. Underground garages and adjoining rooms with hard concrete or cement coating.

X

 

 

Usable floor coverings Tenant floor areas

 

X

282

Wall coverings, wall coverings

X

 

 

Walls wet rooms access core covered with ceramic plates (where not plastered)

X

 

283

Ceiling panelling

X

 

 

Entrance hall and staircase plastered ceilings, wet rooms access core suspended ceilings

X

 

 

Ceiling coverings or ceiling claddings Tenant areas, incl. acoustic ceilings

 

X

285

Internal surface treatments

X

 

 

Coatings on walls and ceilings of underground car parks and ancillary rooms where concrete or brickwork, coatings on walls and ceilings in the development core.

X

 

 

Painting Walls and ceilings Tenant areas

 

X

286

Building drying and building heating

X

 

 

For work on basic construction / tenant construction

X

X

287

Building cleaning (until ready to move in)

X

 

 

for work on basic construction / tenant construction

X

X

290

Fees

 

 

 

Architect, site manager, electrical engineer, HLS engineer for work basic construction / tenant construction

X

X

 

 

 

 

4

Surrounding

 

 

 

Pavements and green areas as well as plantings and environmental equipment

X

 

 

 

 

 

5

Additional building costs

 

 

 

Ancillary construction costs, fees, permits, insurance, construction electricity, water for works Basic expansion/tenant expansion

X

X

 

 

 

 

9

Equipment and equipment

 

 

 

Equipment entrance hall and access core (staircase, lift, wet rooms)

X

 

 

Equipment in the tenants' areas (furniture, equipment, furnishings, acoustic elements, etc.)

 

X